主要论著目录
论文
[1]Lin Pin-nam, H.Putman.Discussion of "Unsteady Flow in Open Channels"[J].Transactions, American Geophysical Union, 1948, 2(30).
[2]John S.Mcnown, Bingnan Lin.Sediment Concentration and Fall Velocity[C]//Second Midwest Conference on Fluid Dynamics, 1951.
[3]Pin-nam Lin.Effect of Spacing and Size Distribution on the Fall Velocity of Sediment[C]//A dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy, 1951.
[4]Lin B.Numerical Analysis of Continuous Unsteady Flow in Open Channels[J].Transactions, American Geophysical Union, 1952, 2(33).
[5]Lin B, E W L A.Discussion of "Turbulent Transfer Mechanism and Suspended Sediment in Closed Channel"[J].Proceeding American Society Civil Engineers, 1952(78).
[6]James R.Barton, Pin-nam Lin.A Study of the Sediment Transport in Alluvial Channels[R].1954.
[7]J.E.Cermak, Pin-nam Lin.Vapor Transfer by Forced Convection from a Smooth[R].Plane Boundary, Civil Engi.Dept.Colorado A &M College, 1955.
[8]林秉南.明渠不恒定流的解法和验正[J].水利学报,1956(1):3-16.
[9]林秉南.光滑平面上的二元风蒸发问题[J].水利学报,1958(1):1-22.
[10]E.W.Lane, Lin Bingnan, H K.Lin.The Most Efficient Stable Channel for Comparatively Clear Water in Non-cohesive Materials Civil Engineering Section[R].Fort Collins, Cotorado, 1959.
[11]林秉南,姜凯,温丽林.不恒定流的闸门流量系数[J].水利学报,1960(1):49-52.
[12]林秉南,龚振瀛.明渠掺气水流的一些运动特性[J].水利学报,1963(2):65-68.
[13]林秉南.坝面高速水流掺气发生点的计算[J].水利学报,1965(5).
[14]林秉南.国外高水头泄水建筑物[R].北京:水利电力信息所,1975.
[15]林秉南,龚振瀛,刘树坤。收缩式消能工和宽尾墩[R].北京:水利水电科学研究院,1979.
[16]林秉南,赵雪华,施麟宝.河口建坝对毗邻海湾潮波影响的计算(二维特征理论法)[J].水利学报,1980(3):16-26.
[17]林秉南。明渠不恒定流研究的现状和发展[M]//水利水电科技进步.北京:水利出版社,1980.
[18]Lin B, Wang L, Gong Z.Dam-site Hydrographs due to Sudden Release[J].Scientia Sinica, 1980,23(12).
[19]林秉南,龚振瀛,王连祥.突泄坝址过程线简化分析[J].清华大学学报(自然科学版),1980(1):17-31.
[20]Lin B.Flaring Gate Piers-an Innovative Idea in the Hydraulic Design of High-velocity Spillways[R].Colorado State Univ., 1981.
[21]林秉南,黄菊卿,李新春.钱塘江河口潮流输沙数学模型[J].泥沙研究,1981(2):16-29.
[22]Bingnan Lin, Zheheng Pai, Kuanbin Li.Unsteady Flow Studies in China [J].Proceedings of the American Society of Civil Engineers,ASCE,1982,108(WW3).
[23]Bingnan Lin, Gong Zhenying, Pan Donghai.A Rational Profile for Flip Buckets of High Dams [J].Science in China,Ser.A, 1982(12): 1343-1352.
[24] 林秉南,龚振瀛,潘东海.高坝溢洪道反弧的合理形式[J].水利学报,1982(2):1-8.
[25]Jikang Lu, Bingnan Lin, Zhengyinggong.Dam-Break Waves in Prismatic Channels[C]//Proceedings of the Second Asian Congress of Fliuid Mechanics, 1983.
[26]Bingnan Lin, Juging Huang, Xinquen Li.Unsteady Transfer of Suspended Load at Small Concentrations[J].Journal of Hydraulic Engineering-Asce, 1983,1(19).
[27]时启遂,郭志杰,黄荣彬,陈炳新,林秉南.自然掺气水流浓度和速度量测方法的实验研究[M]//水利水电科学研究院论文集:第13集.北京:水利电力出版社,1983.
[28]何少苓,林秉南.破开算子法在二维潮流计算中的应用[J].海洋学报(中文版),1984(2):260-271.
[29]Pin-Nam Lin, Hsieh-wen Shen.2-D Flow with Sediment by Characteristics Method [J].Journal of Hydraulic Engineering-Asce, 1984, 5(110).
[30]林秉南.流体力学在我国水利工程中的一些应用[J].力学与实践,1984(3):2-7.
[31]Lin B.Fluid Mechanics Serving Hydraulic Engineering in China[M].Beijing, China: Science Press, 1984.
[32]Lin B.Recent Chinese Trend of Research on Unsteady Flow in Open Channels[Z].1984.
[33]Lin B, Gong Zhenying.Study of Dam-break Flood[Z].1985.
[34]Lin B.Trends of Research on Tidal Flow in Estuaries of China[R].fort Collins, Colorado,1985.
[35]何少苓,龚振瀛,林秉南.隐式破开算子法在二维潮流计算中的应用[J].海洋学报(中文版),1985(2):225-232.
[36]林秉南.我国高速水流消能技术的发展[J].水利学报,1985(5):23-26.
[37]林秉南,李乐月.我国对泥沙不稳定输移的研究近况[J].江西水利科技,1985(1):61-64.
[38]陆吉康,林秉南,龚振沄,等.棱柱体河道的溃坝波[J].江西水利科技,1985(1):57-60.
[39]林秉南,陈景森.我国近来对明渠不稳定流研究的趋向[J].江西水利科技,1985(1):65-70.
[40]林秉南,何少苓,慕京,等.河口潮流与污染扩散场的二维数值模拟[J].科学通报,1986(24):1916-1920.
[41]Shaoling He, Bingnan Lin.2-D Tidal Flow by Operator-splitting Method[J].Acta Oceanologica Sinica, 1986(4): 508-516.
[42]林秉南.略谈三峡库区二维动床数学模型[J].三峡工程科技通讯, 1986(1).
[43]Lin B L, Li Guifen.The Changjang and the Huanghe-Two Leading Rivers of China[Z].IRTCES, 1986.
[44]Zhang Qishun, Jiang Naisen, Lin Bingnan.Environmental Problems Associated with Sediment Deposition in Guanting Reservoir[J].International Journal of Sediment Research, 1986.
[45]Lin B, Li G, Chen H.Hydraulic Research in China [J].Journal of Hydraulic Engineering, 1987,113(1):47-60.
[46]刘智,林秉南,何少苓.三角形网格在二维不恒定流计算中的应用[J].水利学报,1987(9):25-33.
[47]林秉南.关于加速发展泥沙数学模型的想法[J].泥沙研究,1988(1):87-89.
[48]林秉南,韩曾萃,孙宏斌,等.潮汐水流泥沙输移与河床变形的二维数学模型[J].泥沙研究,1988(2):1-8.
[49]Lin B.Recent Chinese Progress in Hydraulics[C]//6th Congress of APD-IAHR.Kyoto,1988.
[50]Zhengying Gong, Bingnan Lin.Simplified Calculation of ECN Curve for High Ski-jump Spillway[C]//6th Congress of APD-IAHR.Kyoto,1988.
[51]Bingnan Lin, Guifen Li.Chinese Research on High-velocity Flow and Principal Developments in the Art of Energy Dissipation[C]//International Symposium on Hydraulics for High Dams.Beijing, 1988.
[52]Lin B.Hydraulic Research in Service of Design-Chinese Experience[C]//Second International Symposium on the Design of Hydraulics Structures.1989.
[53]Bingnan Lin, Guoren Dou, Jianheng Xie, et al.On Some Key Sedimentation Problems of Three Gorges Project(TGP)[J].International Journal of Sediment Research, 1989(1).
[54]林秉南,陈志轩.试论三峡工程泥沙问题[J].科技导报,1989(6):39-43.
[55]Bingnan Lin.Urban Drainage and Flood Control in China, Historic and Present[C]//proceedings of the 5th International Conference on Urban Storm Drainage, Japan, 1990.
[56]王兆印,林秉南,张新玉.非牛顿体不稳定流的研究[J].力学学报,1990(3):266-275.
[57]ZHOU Jianjun, LIN Bingnan, WANG Lianxiang.A New Methematical Model for 2-D Flow [J].1991,6(1): 53-70.
[58]周建军,林秉南,王连祥.河道平面二维水流数值计算[J].水利学报,1991(5):8-18.
[59]谢省宗,林秉南.宽尾墩消力池联合消能工的消能机理及其水力计算方法[J].水力发电,1991(1):50-53.
[60]林秉南.减免重庆港整治和增强三峡水库防洪能力的水库调度方式初议——双汛限水位调度方案[R]//中国水利水电科学研究院及国际泥沙研究培训中心报告.1992.
[61]周建军,林秉南,王连祥.平面二维泥沙数学模型研究及其应用[J].水利学报,1993(11):10-19.
[62]周建军,王连祥,林秉南.明渠不恒定分离流数值模拟及试验验证[J].水动力学研究与进展(A辑),1993(1):28-34.
[63]林秉南.对悬移质变态动床模型试验中掺混相似条件的剖析[J].人民长江,1994(3):1-6.
[64]周建军,林秉南.2-D Mathematical Model for Suspended Sediment Partl-Model Theories and Validations [J].应用基础与工程科学学报, 1995(1):78-98.
[65]林秉南.三峡水利枢纽工程几个关键问题的应用基础研究[J].中国科学基金,1997(1):10-14.
[66]Wang Z, Lin B, Nestmann F.Prospects and new problems of sediment research [J].International Journal of Sediment Research, 1997, 12(1):1-15.
[67]Zhou J, Lin B.One-dimensional mathematical model for suspended sediment by lateral integration [J]•Journal of Hydraulic Engineering, 1998,124(7):7f2-717.
[68]林秉南.大洪水后的一些思考[J].中国水利水电科学研究院学报,1998,2(2):1-7.
[69]Lin B, Zhou J, Zhang R.Diverting Seawater to Scour the Estuary A Quest for New Approach to Regulate the Lower Yellow River [J].International Journal of Sediment Research, 1999, 4(14).
[70]Zhou J, Lin B.Sedimentation in Lock Approaches of Three Gorges Project(TGP)[C]//Procedings of Seventh International Symposium on River Sedimentation.1999.
[71]林秉南,张光斗.关于防治我国洪涝灾害的意见[J].水问题论坛,1999(3).
[72]周建军,林秉南,张仁.三峡水库的双汛限水位调度方式研究[J].水利学报,2000 (9).
[73]林秉南,张仁,周建军.对黄河下游治理的管见[J].中国水利,2000(9):7-9.
[74]陈稚聪,林秉南.用盐水减少异重流泥沙淤积的试验研究[J].泥沙研究,2000 (5):32-36.
[75]周建军,林秉南,张仁.三峡水库减淤增容调度方式研究——双汛限水位调度方案[J]•水利学报,2000(10):1-11.
[76]周建军,林秉南,张仁.关于兴建江汉排洪通道缓解长江和汉江洪水的设想[J]•水利学报,2000(11):84-8.
[77]林秉南,周建军,张仁.引海水冲刷河口治理黄河下游[J].中国工程科学,2000(4):25-33.
[78]周建军,林秉南.双汛限水位调度方案对三峡工程通航条件的影响[J].中国三峡建设,2002(6):4-7.
[79]周建军,林秉南,张仁.三峡水库减淤增容调度方式研究——多汛限水位调度方案[J].水利学报,2002(3):12-19.
[80]Jianjun ZHOU, Binliang LIN, Bingnan LIN.Rational Basis for Suspended Sediment Modeling [J].International Journal of Sediment Research, 2003,18(3): 177-195.
[81]林秉南,周建军.利用三峡枢纽下泄“清水”改善洞庭湖和荆江的防洪局面[J].中国三峡建设,2003(12):4-6.
[82]周建军,林秉南.对黄河潼关高程问题的认识[J].中国水利,2003(12):47-49.
[83]王兆印,林秉南.中国泥沙研究的几个问题[J].泥沙研究,2003(04):73-81.
[84]周建军,林秉南.从历史看潼关高程变化[J].水力发电学报,2003(3):40-49.
[85]周建军,林秉南.从三门峡水库水沙条件变化看渔关高程[J].水力发电学报,2003(3):50-58.
[86]周建军,林秉南.从三门峡水库的运行看潼关高程的变化[J]7.水力发电学报,2003(3):59-67.
[87]周建军,林秉南。关于黄河治理的一些看法[J].科技导报,2003(6):3-8。
[88]林秉南。再论悬移质变态动床模型试验的掺混相似条件[J].人民黄河,2003(9):14-15。
[89]林秉南,周建军.三峡工程泥沙调度[J].中国工程科学,2004(4):30-33.
[90]林秉南.论泥沙观测方法的部分改革[J].中国水利水电科学研究院学报,2004(3):77-78.
[91]Bingnan LIN, Ren ZHANG, Dingzhong Dai, et al.Sediment Research for the Three Gorges Project on the Yangtze River Since 1993[Z].2004.
[92]Lin B, Zhou J.Sediment Management for TGP[J].Engineering science, 2004(6):30-33.
[93]Zhou J, Lin B.Verification of mathematical model for sediment transport by unsteady flow in the lower yellow river[J].International Journal of Sediment Research, 2004, 19(4):278-291.
[94]林秉南.河流悬移质泥沙冲淤数学模型导论[J].水利学报,2006,37(12):1523-1524.
[95]周建军,林秉南,李玉樑.关于三峡水库内源污染控制的研究[J].科技导报,2006(10):5-10.
[96]林秉南,窦国仁,谢鉴衡.从新近研究成果看三峡工程的一些泥沙问题[C]//城乡饮用水水源安全问题与发展汇总,2009:66-70.
著作
[97]林秉南,等译.高速水流论文译丛[M].北京:科学出版社,1958.
[98]林秉南.工程泥沙[M].北京:水利电力出版社,1992.
[99]林秉南.林秉南论文选集[M].北京:中国水利水电出版社,2000.